How to get ARC approval
What the ARC does
Many associations have an Architectural Review Committee (ARC), sometimes called a design review committee, or the board does this job itself. Its role is to apply the community's recorded rules (usually the CC&Rs and any design guidelines) so changes to the outside of homes stay consistent. Typical projects needing review include fences, exterior paint, roofing, additions, sheds, patios and covers, landscaping changes, driveways and solar panels.
Step 1: Read your governing documents
Look in your CC&Rs and any architectural guidelines for: which projects require approval, the application form, the submission address or portal, the review timeline, fees if any, and what happens if the committee doesn't respond. Ask your manager or board for current copies if you don't have them. These documents differ for each association, and they control.
Step 2: Prepare a complete request
Incomplete requests cause most delays. Include:
- Your name, address and contact information
- A clear description of the project and materials (brand, color name or code, dimensions, height)
- A site plan or sketch showing where it goes relative to property lines and neighbors
- Photos, product pictures or color samples
- The contractor's name and license information, if using one
- Planned start and finish dates
- Any neighbor signatures if your documents ask for them
Step 3: Submit and keep proof
Use the method your association specifies. Keep a copy of everything and proof of the date submitted (email receipt, portal confirmation or certified mail). Do not start work before you have written approval.
Step 4: Wait for a decision, then follow the approval
Review timelines vary, so check your documents. If the committee approves with conditions, follow them exactly, and build what was approved. If you change the plan, submit an updated request first. When done, notify the association if it requires a completion notice.
If you are denied or hear nothing
- Ask for the reason in writing and the specific rule it relies on.
- Offer a revised request: changing a color, height or material often resolves it.
- Ask whether your documents provide an appeal or a hearing before the board.
- If the documents say a request is deemed approved or denied after a deadline, follow the documents and consider professional advice if the dispute continues.
- Keep communication polite and written. Volunteer committees are usually trying to apply the rules fairly.
Idaho law note: solar panels
Idaho law says an association may not add, amend or enforce a covenant in a way that prohibits rooftop solar panels or solar collectors. The association may specify the roof location when installation is permitted on a south-facing orientation or within 45 degrees east or west of due south, and may adopt reasonable rules (for example, panels parallel to the roofline, and painting visible brackets or wiring to match) (Idaho Code 55-3208). Other Idaho statutes address some other items, such as flags, political signs and accessory dwelling units (Homeowner's Association Act, Title 55 Chapter 32). Read those sections if your project touches them.
City permits are separate
HOA approval does not replace a city or county building permit, and city approval doesn't replace HOA approval. Check with your city's building department (Meridian, Kuna, Star, Caldwell).
Tips
Submit early, include more detail than you think you need, talk to neighbors who may be affected, and get approval in writing before you pay a contractor.
For boards
Boards that publish a one-page checklist and a clear review timeline get fewer incomplete requests and fewer disputes. See our board guides.